A Bridge Too Far
From Concept to Installation in under two weeks.
Team work, cooperation and good design were instrumental in achieving the necessary result: A curving and spiralling bridge to carry golf buggies across a new water feature.
We even had time to illustrate our ideas to the team through a “JoinMe” meeting before the detailed design and manufacturing drawings were produced.
Our design was quick to manufacture, the parts were small enough to manhandle into position and easy to assembly into a strong and stable structure. Other design features allowed the carpenters laying the decking to work quickly by minimising the number of cuts required.